What we had in front of us for the last weeks was demolishing the old Church and many materials from that operation filling our site.
Obviously the pilling has taken place and been completed.But this is an operation that is mainly done underneath and doesn’t show so much above the earth level.
Now, with the concrete blinding as well as with the raft slab edge shutter we’ve began to see the actual outline of the new Church.
This is certainly very exciting. Soon we’ll be able to see the whole of the outline, like the plan on the paper. We can’t wait.