Friday, 6 May 2011

Marble staircase

Within the Bell Tower there is a staircase. This leads to the Gallery of the Church as well as to the top of the Church roof and to the bells.


The staircase has now been marbled with nice white shining marble.


The marble technician who worked hard to place all the marble tiles on the stairs is Mr. Marios Athanasiou.

Friday, 8 April 2011

Floor day

It is only one day away from the Official Opening, which is to take place tomorrow evening, from 6.00 pm.



Many works have obviously to be done still, as this is a major project.


It seems like the main concern today is the floor, both outside and inside our new Church.


Black tarmac is spread out and levelled throughout the front yard of the building.


At the back of the Church special workers are laying there a brick surface.




Inside the Church the marble specialists are placing the last marble plaques on the floor.

Wednesday, 30 March 2011

More doors, marbles and wall

The works are continuing intensively, as we are reaching the final week, before the official opening.

The three carpenters from Cyprus are working hard fitting doors in their places.


Both outside as well as inside doors are being put in place.

The little Church Office has now its own door leading into the main Church.

The marble specialists are still working in the interior, producing some real pieces of art.

The Irish bricklayers are working outside, preparing the new front wall.

Thursday, 10 March 2011

Sanctuary floor

The marble technicians have completed the floor of the Sanctuary.

They will now continue working in other areas of the main Church.

Friday, 25 February 2011

Today’s photo-reportage

Mik the foreman and Adrian in front of the Dome:

The main gallery floor level has now been marbled:

Marble tiles are nicely placed on the floor of the main Church:

The first electrical control panel has now been fixed in the Sanctuary area:

Some “toys for the boys” in the car park area:

Looking out and arranging the next steps, by Trevor the Project Manager and his work aides:

Good co-operation amongst our staff and their hard work has produced some real miracles in our sacred project.

Thursday, 24 February 2011

Marble tiles in the main Church

The floor of the gallery has now been fully marbled.

The marble specialists have now been moved to the main Church and they are placing the marble tiles there.

Thursday, 17 February 2011

Meeting and Marbles

A meeting was organised today in order to clarify various details of the building process.

The meeting was attended by leaders of our Community, members of the building company and some of our professionals.

In the meantime the marble specialists had progressed with the making of the marble floor on our new Church’s balcony.

Wednesday, 16 February 2011

Marbles in

A lot of marble tiles have now been delivered to our new Church.

They have been stored in the interior of the Church together with some other relevant material.

The marble specialists have now started working in the Church in order to form a marble floor.

Today the gallery is being marbled and it really looks very shiny and stylish.

Thursday, 20 May 2010

Visit to Mr. Costas Sakellarios

Today we had the honour of visiting Mr. Costas Sakellarios and had an interesting meeting with him.

Fr. Anastasios, our Architect Mr. Michael Neocleous, our Treasurer Mr. Soteris Constantinou and Mr. Christos Orthodoxou visited the company Pisani Group, owned by a Greek man, Mr. Sakellarios.

This company specialises in marble works. We had an interesting initial meeting about the marbles we are going to use on the floor of our new Church. Mr. Sakellarios was very helpful and supportive towards our sacred project. We shall meet again soon in order to organise and finalise our cooperation in this matter.