Tarmac on the Car Park

Works have progressed greatly in our Car Park area.




After many days of intense preparations today tarmac is being laid on the Car Park, and it really looks very impressive.




The engineers and workers are expecting to complete the works by tonight.

Friday, 2 December 2011

Great sunshine

The day bathed in sunshine today, although it is obviously a winter day, as the temperature is about 2 Celsius degrees.


Our parking specialists are working this morning in our Church’s Car Park.


They are smiling and happy people and they enjoy working at our Church yard.


They certainly like being photographed and they hope to complete their work soon.

Thursday, 1 December 2011

Parking spaces

Works continue today in our Church’s Car Park area.



Individual parking spaces are now visibly designed and built.


This is another part of the great building and constructing craftsmanship.

Wednesday, 30 November 2011

Car Park progress

St. Andrew’s day today. We had a fully packed Church when we celebrated the Divine Liturgy in the morning.


At the same time works in our Church’s Car Park has progressed.


Fortunately parking is not that bad in our area; thus people coming to Church or to our Schools they can park elsewhere nearby.


We hope though to have the Car Park completed as soon as possible.

Tuesday, 29 November 2011

Church Car Park

Our Church’s Car Park has been used for the last few months, although it hasn’t as yet been fully completed.




IBEX and its subcontractors are in our premises since yesterday working towards finalising the Car Park.




New lines are being designed and drawn on the surface.




The 4 first pictures are from yesterday, while the last two from today.

Wednesday, 20 April 2011

Tarmac on the car park

One of the essential works outside our new Church building is the sorting out of the car park.




The car park area has now been tarmaced and looks very nice and tidy.






Not all works in the car park have been finalised as yet, but we are on good course.

Friday, 8 April 2011

Floor day

It is only one day away from the Official Opening, which is to take place tomorrow evening, from 6.00 pm.



Many works have obviously to be done still, as this is a major project.


It seems like the main concern today is the floor, both outside and inside our new Church.


Black tarmac is spread out and levelled throughout the front yard of the building.


At the back of the Church special workers are laying there a brick surface.




Inside the Church the marble specialists are placing the last marble plaques on the floor.

Friday, 25 February 2011

Today’s photo-reportage

Mik the foreman and Adrian in front of the Dome:

The main gallery floor level has now been marbled:

Marble tiles are nicely placed on the floor of the main Church:

The first electrical control panel has now been fixed in the Sanctuary area:

Some “toys for the boys” in the car park area:

Looking out and arranging the next steps, by Trevor the Project Manager and his work aides:

Good co-operation amongst our staff and their hard work has produced some real miracles in our sacred project.